Process
Project timeline
Four clearly defined phases from confirmed order to a generating plant — roughly six weeks end to end.
From order to generation
Scroll to follow the flow — each stage lights up as the project advances.
- 017 Days
Finalization of Design and Drawings
Site survey, shadow analysis and sanctioned-load check, followed by structural and electrical drawings for your approval.
- Site survey & shadow study
- Structural + SLD drawings
- Customer approval sign-off
- 0215 Days
Engineering, Procurement and Supply of Material
Modules, inverters, structures, cables and the full balance of plant are engineered, procured and delivered to site.
- Modules & inverter dispatch
- GI structure fabrication
- Cables and balance of plant
- 0310 Days
Solar Plant Installation
Structure erection, module mounting, inverter, AC-DC cabling, LT panel work and monitoring system installation.
- Structure erection
- Module & inverter mounting
- AC-DC cabling + LT panel
- 0410 Days
Commissioning and Testing
Testing, zero-export device setup, commissioning of the plant and power evacuation to the LT panel — then handover.
- Zero export device setup
- Testing & commissioning
- Monitoring app handover
The full roadmap
A week-by-week view of the same journey — sunlight travels the rail as your project moves from drawings to live generation.
- Week 1
Design & drawings
Survey, shadow study, approvals
- Week 2–3
Procurement
Modules, inverter, structures
- Week 4
Installation
Structure, modules, cabling
- Week 5
Commissioning
Testing, zero-export, handover
- Day 1 onward
Generation
Live monitoring on your phone
Our Scope
- Preparation of engineering drawings and design for solar structure and power plant as per relevant IS standards
- Supply of solar modules, inverters, structures, cables and balance of plant
- Installation of structure, modules, inverter, AC-DC cable and LT panel
- Installation of the monitoring and controlling system
- Commissioning of the plant and supply of power to the LT panel
- Zero Export Device installation
Customer Scope
- Safe storage place for material during installation and commissioning
- Space to evacuate the solar power
- Design and drawing approval within 7 days